Mind you, I was only over on quotes. So I hadn't actually SPENT any money yet. But still. I was bummed. My "caviar tastes on a beer budget" were catching up with me. Drat.
Today was also the day that I met with the electrician for the placement of the outlets and lights in the attic. You can tell a good electrician by the notations he makes on the boards. Weird hieroglyphic like things that only electricians know. So strange.
Anyhow, he liked my ideas for the placement of outlets/switches. And we agreed on most everything. He thought for sure I was a "can light" kinda girl (I am not) and was pleased when I gave the big negative on can lights. My rationale (which is probably outdated) is that they are hot. And it's an attic. I don't need a spot light on my bed. I need to be able to enjoy my space, and soft lighting through strategically placed lamps will suit my purpose. He did, however, give me a little bonus. He placed the switch for the outside light (motion light on the driveway) at the top of the stairs. That way, if I was concerned about anything outside, I could turn the light on while still upstairs. I thought that was pretty cool. So I like John.
I'm going to have almost 10 foot ceilings at the tallest point, where the collar ties will be placed. So I'm putting in a ceiling fan. I still have to decide on my lights in the bathroom, although I'm pretty sure I've made that (overpriced) decision.
Feeling rather good about things, I should have known it would be short lived. The plumber was ready to rough in the shower, but...he was waiting on an inspection at another location. I thought I had gotten a reprieve from making decisions. Nope, not so much. It appears that because I've been stalling on the vanity decision, I may have unwittingly delayed the bathroom installation. While that choice was still up in the air, the tile had to be picked out. I got the "get on it" talk. The only saving item was that the plumber was waiting to finish up the other location, but I could potentially be pushing back my own work. Bad homeowner. I'm back on the hunt from a vanity this weekend. Sigh...And floor tile.
I started the sanding of the kitchen cabinets. That's kinda fun and mindless. And tedious. I
| "During" |
| Obviously "the before" |
One step forward, a couple to the side. Nothing backwards just yet. But at least it's just my fault. I can handle being angry with myself!
No comments:
Post a Comment