I had to leave town for work for days 58 thru 63. It was a good thing and a bad thing. It was good because I needed to step away again. I was working a lot of hours at the house and I needed a break. But at the same time, things were starting to move forward at a really fast pace! I hated to miss it.
When I left, I had drywall. And when I returned...I had a ROOM. That's right. The attic is now, really and truly, a room. With paint and ceiling texture and a door and baseboard. I'm just amazed. Simply amazed.
Here's a slow progression of the attic renovation.
|
Raw oak cap on the wall around the stairs |
|
New framing around the windows |
|
Trying to match the door style |
And then we get paint and stain:
|
Looks very close to the other doors |
|
Hello Painters |
|
This may be my favorite thing. The craftsmanship |
In addition to the painting upstairs, the kitchen counter was finally "fully" installed. Again, I'm just amazed by these countertops. And by adding 1 1/2" lip to the countertops, I feel like I have more counter space. Plus... BACKSPLASH. Can I just say...I'm so pleased with my choices. Everyone knows Purple is my favorite color, but I think I'm rocking the green pretty well. And black!
|
Partially painted, backsplash tile started |
|
Loving the tile |
Then there's the floor in the master bath...Yeah. I'm geeking out a little...
|
Subfloor |
|
TILE!!! |
And finally... the hardwood floors...almost complete. And so PRETTY!! Coat 3 will be done coming up in the next couple of days.
|
Stain Choices |
|
Raw floors, beautiful! |
|
2 coats |
|
1 coat |
So we're winding down. Or ramping up. Take your pick. It's all coming together like a well oiled machine, except maybe a couple of weeks behind my schedule. I won't be able to move in by September 30, but when I do move in, most, if not all of the small items will be completed. I can hardly wait!
So exciting! I can't wait to see it all in person!!